The 45-story Torre David office tower in Caracas, Venezuela, was nearly complete in the early 1990s when a pair of events changed the building’s trajectory forever: First, the project’s developer, David Brillembourg, died in 1993. Then, the next year, Venezuela’s economy cratered. Torre David, about 90% finished at the time, was abandoned–as both a project and a property. Electrical infrastructure had not yet been installed. The lower stories were still missing finished flooring, sewage pipes, and paint. Large slabs of marble meant for a luxury hotel on the first six floors had been carted into the building but never installed.